The Government has confirmed satellite Wi-Fi for GWR intercity trains through Exeter. In a Penzance to Paddington pilot, passengers stayed online 98% of the way.
Great Western Railway intercity trains serving Exeter are to get superfast Wi-Fi that combines satellite and mobile signals, after the Government confirmed it would pay for the rollout.
In a pilot on a GWR train between Penzance and London Paddington, passengers could get online for 98% of the journey. With the current technology, they can typically connect for only 25% of it, according to the office of Exeter MP Steve Race, who led the campaign for the money.
Overview
- What: next-generation superfast Wi-Fi, using satellite and mobile phone signals together, on GWR intercity trains.
- Which trains: the GWR intercity fleet, which the MPs’ letter says serves the routes from London Paddington to Penzance, Bristol and South Wales, including trains through Exeter St Davids.
- The difference: online for 98% of the Penzance to Paddington journey in the pilot, against about 25% today.
- The money asked for: £12m, out of a £57m Government budget for better connectivity on mainline trains.
- When: no start date has been announced. The Transport Secretary says more details will follow “soon”.
From a pilot to a rollout
The pilot was run by Peninsula Transport, the sub-national transport body for the South West peninsula. According to the MPs’ letter, it had been running on a GWR Intercity Express Train since November 2025 and combined existing mobile network signals with satellite connectivity.
In March, Mr Race co-ordinated a letter from South West and South Wales Labour MPs to the Transport Secretary, Heidi Alexander, asking for £12m of the £57m to be put towards the scheme. He later met her to make the case. The Government has now confirmed the rollout and called the project a “trailblazer”, Mr Race’s office said.
The letter, dated 23 March 2026 and signed by 12 MPs, said the pilot had given “near-constant Wi-Fi connectivity, fast download and upload speeds and data capacity to meet the needs of both business and leisure passengers”, backed by positive passenger surveys carried out on board. It also argued that faster connections would ease the experience on routes where, it said, services “are set to slow down as a result of track realignment from HS2”.
With funding confirmed, the MPs wrote, Peninsula Transport could turn the pilot into a Pathfinder Project for the Department for Transport. They had been told then that benefits to the network “could come as soon as the end of the year”.
Read the MPs’ letter of 23 March 2026 (PDF)
Besides Mr Race, it was signed by Sadik Al-Hassan (North Somerset), Tonia Antoniazzi (Gower), Anneliese Dodds (Oxford East), Damien Egan (Bristol North East), Jayne Kirkham (Truro and Falmouth), Noah Law (St Austell and Newquay), Kerry McCarthy (Bristol East), Perran Moon (Camborne and Redruth), Simon Opher (Stroud), Fred Thomas (Plymouth Moor View) and Henry Tufnell (Mid and South Pembrokeshire).
Earlier this month, MPs whose constituents use the route also wrote to the Financial Secretary to the Treasury, urging him to release the money. Mr Race did not sign that letter: his office says that as a Parliamentary Private Secretary he cannot sign cross-party open letters, so he wrote separately to back the campaign.
What the MP said
“I’m delighted that the Government has responded to our call to rollout superfast Wi-Fi on intercity GWR trains,” Mr Race said.
“I know how frustrating it can be to settle down for a long train journey with plans to get some work done, only to find the internet keeps dropping out.
“Whether you need to respond to emails, keep in touch with family and friends, or get on with studying, having reliable [internet] access and connectivity is an important part of modern travel. This news will make a huge difference and will make travel to and from the South West on public transport a far more attractive option.”
What the Transport Secretary said
Heidi Alexander said: “The rollout of this super-fast satellite wifi technology will be transformative for passengers throughout the South West, whether they are working, studying, or streaming.
“Labour MPs along the Great Western Mainline have tirelessly made the case for this investment and I am delighted to have delivered it as Transport Secretary.
“This is just one of the improvements we are making as GWR moves back into public ownership, I look forward to sharing more details soon.”
GWR’s move into public ownership
GWR is due to come into public ownership on 13 December 2026, under the Government’s plans to bring rail services back under public control. Mr Race’s office described the Wi-Fi announcement as a “bonus of nationalisation” for passengers on the intercity routes between London and the Westcountry.
For trains over Christmas, see our page on Exeter to London trains while Paddington is closed.
Source: Office of Steve Race MP.
Have your say